MRM Engineering Pte Ltd is one of the preferred partners for Mark point Engineering Pte Ltd,
- Proposed Fit-Out Works To Guestrooms, Suites, Executive Lounge, Corridors, Lift Lobbies Of Existing Swisshotel The Stamford Hotel (Tower Only) At Stamford Road Singapore.
- Proposed Additional & Alteration To Existing Introbar, Equinox, City space At Swiss Hotel The Stamford,2 Stamford Road Subcontract Works For Dismantle And Installation Of New Complete Plumping & Sanitary System Works.
- Proposed Conversion Of 2 Blocks Of Existing 19-Storey Condominium Flat Development (Total 85 Units) With 2 Basement Carparks, Swimming Pool And Communal Facilities To Serviced Apartments (Total 113 Units) And Retaining 2 Existing Flat Units On Lots 370x, 371l, 372C, 373M, 374W, 375V, 382K, 383N, 384X, 385L, 386C, 387M, 488l, 533C, 535W, 537P, 539A, 623M, 1409N And 1410ATS 21 At Paterson Road/Lengkok Angsa (River Valley Planning Area).
MRMI CONSTRUCTIONS PRIVATE LIMITED is one of the preferred partners for Mark point Engineering Pte Ltd,
- Proposed Fit-Out Works To Guestrooms, Suites, Executive Lounge, Corridors, Lift Lobbies Of Existing Swisshotel The Stamford Hotel (Tower Only) At Stamford Road Singapore.
- Proposed Additional & Alteration To Existing Introbar, Equinox, City space At Swiss Hotel The Stamford,2 Stamford Road Subcontract Works For Dismantle And Installation Of New Complete Plumping & Sanitary System Works.
Safety Conscious
Safety mind-set is the back bone of our company culture and we did it as passion. The bizSAFE promotes workplace safety and health through the recognition of safety and health efforts. MRM is proud to have received the bizSAFE level 3 certification awarded by the Workplace Safety and Health (WSH) Council.
Track Records
- Supporting ready mix concrete trucks works under Island Concrete Pte Ltd
- Supporting concrete trucks works under Pan United Concrete Pte Ltd
- Supporting concrete trucks works under Pan United Concrete Pte Ltd
- Logistics works under 3B Transport Pte Ltd, Sheng Transport Pte Ltd & SKK Transport Pte Ltd etc.
- Supporting Tipper trucks works under KTC.
Our Facilities
Total Employees: 200 Employees
Logistics works, Plumbing Works, Sprinkler works, Electrical works, and Varnishing & carpentry works, Telecommunication, Labour contract for Excavation & Earth moving works, Underground pipe line works, Concreting, Minor Construction and Renovation
Ramasamy Subburaman
Director and Technical Department Head
Lorem ipsum gravida nibh vel velit auctor aliquetn sollicitudirem quibibendum auci elit cons equat ipsutis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet . Morbi accumsan ipsum velit. Nam nec tellus a odio tincidunt mauris.
Auci elit cons equat ipsutis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet . Morbi accumsan ipsum velit. Nam nec tellus a odio tincidunt mauris
Buci elit cons equat ipsutis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet . Morbi accumsan ipsum velit. Nam nec tellus a odio tincidunt mauris